offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Fugro Wins Further Work on Borssele Offshore Wind Zone
Authorities

May 21, 2015 · about 11 years ago

Fugro Wins Further Work on Borssele Offshore Wind Zone

The Netherlands Enterprise Agency (RVO.nl), part of the Ministry of Economic Affairs, has signed two contracts with Fugro that cover further mapping the Borssele offshore wind energy zone. The company will take measurements of wind and sea conditions, and to research the seabed. Fugro will start sho

1 minutes read
  • LinkedIn
  • X
  • Email

The Netherlands Enterprise Agency (RVO.nl), part of the Ministry of Economic Affairs, has signed two contracts with Fugro that cover further mapping the Borssele offshore wind energy zone.

The company will take measurements of wind and sea conditions, and to research the seabed.

Fugro will start shortly with the measurements of wind and sea conditions at future wind farm locations. The wind speed will be measured with laser beams from a floating buoy, providing crucial information for developers who will use the data to calculate the expected yields of the planned wind farms in the wind area Borssele as accurately as possible.

By examining the seabed, detailed information on water depth, geology and possible obstacles on the seabed of the Borssele sites III and IV will be obtained. With these information, developers can find an optimal design for offshore wind farms and the construction of the necessary electrical infrastructure.

Information about the soil, wind and water conditions of the wind farm sites will be available to commercial parties. They can then use the information as an input for their tenders.

Last month , Fugro won a contract to carry out the geotechnical site investigation and geological modelling of sites I and II of the future Borssele wind farm zone.

The first call for tenders for Borssele zone will start in December 2015, and the one for III and IV sites will be launched in 2016.

Image: Fugro

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & FinanceR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago