offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Energinet.dk Seeks Cable Route Survey Services
Grid Connection

May 22, 2015 · about 11 years ago

Energinet.dk Seeks Cable Route Survey Services

Energinet.dk has issued an invitation to tender for survey of Kriegers Flak’s cable route. The work is expected to be carried out in 2015. As part of the Kriegers Flak (KF) Combined Grid Solution (CGS), the Danish TSO Energinet.dk and the German TSO 50Hertz Transmission GmbH are preparing the instal

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk has issued an invitation to tender for survey of Kriegers Flak’s cable route.

The work is expected to be carried out in 2015. As part of the Kriegers Flak (KF) Combined Grid Solution (CGS), the Danish TSO Energinet.dk and the German TSO 50Hertz Transmission GmbH are preparing the installation of two parallel HVDC cables from the KFBE substation at the planned Kriegers Flak Wind Farm (DK) to the Baltic 2 substation at the Baltic 2 Wind Farm (DE).

The KF CGS cable route survey require geophysical seabed survey and shallow geotechnical investigations with grab sampling, seabed CPT, Vibrocoring and laboratory test. The water depth varies between around 15m and 40m MSL for the majority of the route.

The deadline for submission of tenders is May 26.

Image: Energinet.dk

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

27 days ago