offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›ESVAGT’s Vessels Towing Gode Wind’s Accommodation Module and Jacket
Vessels

June 17, 2015 · about 11 years ago

ESVAGT’s Vessels Towing Gode Wind’s Accommodation Module and Jacket

Heerema Marine Contractors (HMC) has hired the Esvagt Connector and Esvagt Don to tow a floating barge that carries both an accommodation module and jacket from the port of Vlissingen in the Netherlands to the Gode Wind 1 and 2 offshore wind farm site in the German sector of the North Sea. Work star

1 minutes read
  • LinkedIn
  • X
  • Email

Heerema Marine Contractors (HMC) has hired the Esvagt Connector and Esvagt Don to tow a floating barge that carries both an accommodation module and jacket from the port of Vlissingen in the Netherlands to the Gode Wind 1 and 2 offshore wind farm site in the German sector of the North Sea.

Work started on the 10th of June and is expected to finish on the 20th of June 2015.

DONG Energy’s Gode Wind 1 and 2 have a permanent accommodation module, which ESVAGT’s vessels are now helping to bring into position.

“ESVAGT has developed a new way of servicing offshore wind farms with its new SOV concept, but that has not stopped the shipping company assisting offshore wind farms that are run in a more traditional way,” the company said.

Image: ESVAGT

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

10 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

10 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago