offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›FOWIND Identifies Offshore Wind Areas in India
News

June 17, 2015 · about 11 years ago

FOWIND Identifies Offshore Wind Areas in India

The FOWIND Consortium has released pre-feasibility reports (PFRs) for offshore wind development in Gujarat and Tamil Nadu. The reports identify key offshore areas where detailed wind resource assessment should take place off the coasts of the two states. “This is a key first step in identifying site

2 minutes read
  • LinkedIn
  • X
  • Email

The FOWIND Consortium has released pre-feasibility reports (PFRs) for offshore wind development in Gujarat and Tamil Nadu.

The reports identify key offshore areas where detailed wind resource assessment should take place off the coasts of the two states.

“This is a key first step in identifying sites for offshore wind development, and we are pleased to have made this contribution towards India’s development of this clean, indigenous renewable energy resource”, said Steve Sawyer, Secretary General of FOWIND lead partner Global Wind Energy Council. “The next step is actual wind measurements on site.”

These studies will form the basis for future offshore wind feasibility investigations, while at the same time supporting companies and government institutions in developing a better understanding of typical offshore wind project considerations. FOWIND project partner DNV GL has taken the lead on the technical aspects, and partners World Institute of Sustainable Energy (WISE) and Center for Study of Science, Technology and Policy (CSTEP) engaged with multiple state agencies of Gujarat and Tamil Nadu to collect the required data and information. A number of key constraints have been identified, combining both technological barriers and spatial conflicts. Known constraint parameters were modelled to identify eight potential development zones in Gujarat, and eight in Tamil Nadu. As one of the key parameters a meso-scale wind resource map was modelled by DNV GL. Zone identification was followed by a preliminary wind farm design for each zone.

“Offshore wind presents many challenges, but the potential rewards are great”, said Mathias Steck, Sr. VP & Regional Manager, Asia Pacific Energy & Renewables Advisory for DNV GL. “There is a lot to learn from the European experience in offshore wind, but there are also uniquely Indian challenges and opportunities to consider.”

“The pre- feasibility reports for Gujarat and Tamil Nadu are key deliverables of the FOWIND project and provide a solid basis for all future works in the off shore wind sector in India,” said Dr. Johann Hesse, Counsellor, European Union Delegation to India. “The EU being the world leader on offshore wind technologies is committed to support India to advance its efforts in promoting renewable power generation from the off-shore waters”.

In the next phase, the FOWIND project will deploy Light Detection and Ranging (LIDARs) instruments at sites identified in the pre-feasibility studies. This detailed data acquisition; resource analysis and validation of available data is a key step in laying the groundwork for the development of the sector.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago