offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›GEV to Unveil Full-Size Habitat at RenewableUK’s Event
Technology

June 18, 2015 · about 11 years ago

GEV to Unveil Full-Size Habitat at RenewableUK’s Event

GEV Wind Power will unveil a a full-sized model of its innovative turbine blade habitat at the Renewable UK Global Offshore Wind exhibition (24-25th June 2015). Located at stand 102, the Habitat model will be mounted to the outside of a Power Climber blade access platform and visitors will be able t

1 minutes read
  • LinkedIn
  • X
  • Email

GEV Wind Power will unveil a a full-sized model of its innovative turbine blade habitat at the Renewable UK Global Offshore Wind exhibition (24-25th June 2015).

Located at stand 102, the Habitat model will be mounted to the outside of a Power Climber blade access platform and visitors will be able to walk around.

The Habitat enables an engineer to conduct blade maintenance in a weather-protected environment by traveling to the top of the blade on the access platform, attaching the patented seal and extension sleeves before inflating the habitat at the desired location on the blade.

At the same time as remaining dry, the technician will be able to control the temperature and humidity of the environment immediately surrounding the repair area.

The company will also present their Panoblade camera, which rapidly captures high resolution images of an entire turbine blade surface, alleviating the need for ‘hands on’ inspection. The Panoblade camera is already being used in the field by GEV Wind Power clients and has recently been used to inspect over 70 offshore turbines in less than three weeks.

Alastair Gadney, GEV Wind Power’s projects director , comments: “There are significant cost-effective and simple advantages of utilising this remote blade inspection system. With only one operator required to inspect up to five onshore turbines per day or three offshore turbines, this system will offer exceptional savings in both time and money.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago