offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Photo Gallery: Umoe Mandal’s New Offshore Wind Vessel
Vessels

June 18, 2015 · about 11 years ago

Photo Gallery: Umoe Mandal’s New Offshore Wind Vessel

Yesterday, the Carbon Trust hosted the first UK demonstration of the Wave Craft vessel Umoe Ventus at Seawork International 2015 in Southampton. The new vessel, developed by Umoe Mandal with support from the Carbon Trust’s Offshore Wind Accelerator (OWA), is a surface effect ship (SES), using an air

1 minutes read
  • LinkedIn
  • X
  • Email

Yesterday, the Carbon Trust hosted the first UK demonstration of the Wave Craft vessel Umoe Ventus at Seawork International 2015 in Southampton.

The new vessel, developed by Umoe Mandal with support from the Carbon Trust’s Offshore Wind Accelerator (OWA), is a surface effect ship (SES), using an air cushion to lift 80 percent of the vessel and ensuring that only a small part of the hull is in the water.

In March, DONG Energy has chartered the first Wave Craft vessel at the Borkum Riffgrund 1 Offshore Wind Farm in the North Sea.

Images: Carbon Trust/ Dick Hill, Offshore WIND

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

10 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago