offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Bladt: Second Gode Wind 1 TP Batch Sets Sail
Wind Farm Update

June 22, 2015 · about 11 years ago

Bladt: Second Gode Wind 1 TP Batch Sets Sail

On Friday 19 June, the 2nd load out of the 55 transition pieces (TP) for the Gode Wind 1 project was completed from Bladt Industries’ quayside in Aalborg. The load out was carried out by Bladt and after leaving Aalborg, the 500 tonnes heavy transition pieces were sailed to Eemshaven in the Netherlan

1 minutes read
  • LinkedIn
  • X
  • Email

On Friday 19 June, the 2nd load out of the 55 transition pieces (TP) for the Gode Wind 1 project was completed from Bladt Industries’ quayside in Aalborg.

The load out was carried out by Bladt and after leaving Aalborg, the 500 tonnes heavy transition pieces were sailed to Eemshaven in the Netherlands.

The Gode Wind project is owned by DONG Energy and consists of a total of 97 foundations divided into two lots. The 13th and last load out of the 42 transition pieces for the Gode Wind 2 project was finished on Tuesday 9 June.

During the next couple of months, load out of the remaining transition pieces for Gode Wind 1 will be executed from Bladt’s facilities in Aalborg.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago