offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Van Oord to Install Burbo Bank Extension Foundations
News

June 24, 2015 · about 11 years ago

Van Oord to Install Burbo Bank Extension Foundations

Van Oord has signed a contract with DONG Energy for the installation of foundations at the Burbo Bank Extension offshore wind farm in the UK. Van Oord will install the project’s 32 monopiles and transition piece foundations, supply and install the scour protection and provide the logistics between t

2 minutes read
  • LinkedIn
  • X
  • Email

Van Oord has signed a contract with DONG Energy for the installation of foundations at the Burbo Bank Extension offshore wind farm in the UK.

Van Oord will install the project’s 32 monopiles and transition piece foundations, supply and install the scour protection and provide the logistics between the fabrication ports in Germany, Denmark, the United Kingdom and the offshore wind farm. The installation works are planned to take place during the summer of 2016.

The Burbo Bank Extension offshore wind farm is located 8 km off the coast in Liverpool Bay, United Kingdom. With a total of 32 Vestas wind turbines of 8 MW each, the offshore wind farm will have a total capacity of 258 MW.

DONG Energy’s Senior Project Director, Klaus Skoust Moller , said: “Burbo Bank Extension is an exciting project with the potential to power over 180,000 UK homes, and it’s great to sign this agreement with Van Oord for the installation of foundations. This is the last of our main contracts to be signed which reflects that the project is progressing in accordance with the plan. Offshore construction work is expected to begin in 2016, and Van Oord will play an important role in taking this forward.”

For installing foundations at the Burbo Bank Extension offshore wind farm, Van Oord will use its heavy lift vessel Svanen. The installation strategy is based on the feeder concept bringing foundation components floating to the Svanen at the installation site. This method has been optimized over recent years resulting in highly efficient installation cycles. To date, Svanen has successfully installed nearly 500 offshore wind turbine foundations.

Image: vanoord

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago