offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Azura Generates First Power
News

July 7, 2015 · about 11 years ago

Azura Generates First Power

Almost a month after it was deployed by Northwest Energy Innovations (NWEI) at the United States Navy’s Wave Energy Test Site (WETS) near Kaneohe Bay, Oahu, Hawai’i, Azura, the wave energy device, has started generating power. This pilot testing is now giving U.S. researchers the opportunity to moni

1 minutes read
  • LinkedIn
  • X
  • Email

Almost a month after it was deployed by Northwest Energy Innovations (NWEI) at the United States Navy’s Wave Energy Test Site (WETS) near Kaneohe Bay, Oahu, Hawai’i, Azura, the wave energy device, has started generating power.

This pilot testing is now giving U.S. researchers the opportunity to monitor and evaluate the long-term performance of the nation’s first grid-connected wave energy converter (WEC) device to be independently tested by a third party—the University of Hawaii—in the open ocean.

The first phase of Azura’s development involved testing a smaller prototype in a wave tank and later deploying a prototype—at the same scale as the new deployment—in a controlled, open-sea area off the coast of Oregon in 2014.

To further advance Azura towards commercialization, NWEI recently launched its grid-connected 20-kilowatt demonstration project at WETS.

The current phase of in-water testing at the WETS’s 30-meter test berth has already proven valuable in gathering performance and reliability data from the device in deepwater, open-ocean conditions. The data will be used to further optimize Azura’s performance and refine existing wave energy computer simulations, ultimately supporting commercialization of this technology.

NWEI plans to then test the improved design with a full-scale device rated between 500 kilowatts and one megawatt at WETS at even deeper test berths of 60 meters to 80 meters over the next several years, further supporting efforts to build a robust and competitive MHK industry in the United States.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago