offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›DeepOcean to Install Offshore Wind Cables off Belgian Coast
Vessels

July 17, 2015 · about 11 years ago

DeepOcean to Install Offshore Wind Cables off Belgian Coast

DeepOcean 1 UK Ltd., a subsidiary of DeepOcean Group Holding BV (DeepOcean), has been awarded the inter array cable installation contract for the Bligh Bank Phase II Offshore Wind Farm offshore Belgium. Nobelwind NV is developing the Bligh Bank Phase II Offshore Wind Farm with fifty 3.3MW wind turbi

2 minutes read
  • LinkedIn
  • X
  • Email

DeepOcean 1 UK Ltd., a subsidiary of DeepOcean Group Holding BV (DeepOcean), has been awarded the inter array cable installation contract for the Bligh Bank Phase II Offshore Wind Farm offshore Belgium.

Nobelwind NV is developing the Bligh Bank Phase II Offshore Wind Farm with fifty 3.3MW wind turbines offshore Belgium, with an estimated installed generating power of 165MW. The individual turbines are to be connected in strings with 33kV inter-array cables, linking back to the Nobelwind Offshore High Voltage Substation (OHVS).

From this point, an export cable will connect the Nobelwind OHVS to the existing 220kV Northwind OHVS. The offshore wind park will be constructed adjoining the existing phase of the aforementioned Bligh Bank concession, also known as Belwind I.

DeepOcean’s scope under this contract includes pre-lay surveys, pre-lay grapnel runs, installation and trenching of 50 array cables, design and supply of the cable protection systems, installation and trenching of a coupling cable between the Nobelwind and Belwind I OHVS, pull-in and trenching of the pre-installed Nobelwind export cable and all associated design and engineering activities.

Cable termination and testing works, support and management is an option under the current contractual agreement. Design and Engineering works have already started. The offshore execution will start in Q3 2016 and run into Q4 2016. The optional termination and testing scope could run into Q2 2017.

All assigned key vessels and assets are part of DeepOcean’s fleet. The DP2 Support Vessel Deep Helder will support cable lay operations executing crossing preparations, surveys, foundation preparation for the cable pull-ins. The trenching support vessel Volantis, home of the world’s most powerful free-flying jet trencher UT-1, is nominated for all trenching operations.

Image: DeepOcean

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago