offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Two Piriou WFSVs Fully Built and Ready to Go
Vessels

July 21, 2015 · about 11 years ago

Two Piriou WFSVs Fully Built and Ready to Go

Two Piriou wind farm service vessels (WFSV 21w) are now fully built, the company reported. The vessels are 21m aluminum catamarans, intended for the carriage of 12 technicians and small cargoes to and from offshore wind farms. Propulsion is provided by two MAN diesel engines with two HAMILTON water

1 minutes read
  • LinkedIn
  • X
  • Email

Two Piriou wind farm service vessels (WFSV 21w) are now fully built, the company reported.

The vessels are 21m aluminum catamarans, intended for the carriage of 12 technicians and small cargoes to and from offshore wind farms.

Propulsion is provided by two MAN diesel engines with two HAMILTON water jets. Electrical power is provided by alternators clutched on diesel engines CUMMINS for the 24VDC network and by a diesel generator 230 Vac.

The WFSVs are classed by BUREAU VERITAS and meet the requirements of the MCA Small Commercial Vessel Code MGN 280, Area Category 1 (areas of operation up to 150 miles from a safe haven).

The company said that both vessels are now available for sale at Piriou Vietnam.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

18 days ago