offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›NSW Inks Nordergründe Cabling Deal
Grid Connection

July 23, 2015 · about 11 years ago

NSW Inks Nordergründe Cabling Deal

Norddeutsche Seekabelwerke GmbH (NSW), a wholly owned subsidiary of General Cable, was awarded the contract for the supply and installation of inter-array cables for the Nordergründe offshore wind farm. After the first contract was signed on 29 January 2015 the parties to the contract have finished

1 minutes read
  • LinkedIn
  • X
  • Email

Norddeutsche Seekabelwerke GmbH (NSW), a wholly owned subsidiary of General Cable, was awarded the contract for the supply and installation of inter-array cables for the Nordergründe offshore wind farm.

After the first contract was signed on 29 January 2015 the parties to the contract have finished the financial closing on 2 June 2015.

The project includes 18 wind turbines of the 6 MW class and that will be located in the German North Sea within the 12 mile zone north-eastern of island Wangerooge, north of the town of Wilhelmshaven.

The cables will be installed with the cable laying barge NOSTAG10, which is designed for applications in shallow and near-shore waters in close proximity to the shore in water depths of 2.5 m to 10 m.

The subsea cable production is expected to begin in the third quarter of 2015. The cables will be loaded at NSW’s pier directly from the onshore storage onto the NOSTAG10 for transit and installation. The installation is expected to be terminated in the third quarter of 2016.

Erhard Weitzenfelder, Vice President Sales & Marketing : “We look forward to verifying wpd’s trust in competence and performance of NSW to realize this complex project”.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

13 days ago
Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

15 days ago