offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Decision on Dogger Bank Teesside A&B Coming Up
Authorities

August 3, 2015 · about 11 years ago

Decision on Dogger Bank Teesside A&B Coming Up

The UK Energy Secretary is expected to decide on the Dogger Bank Teesside A&B offshore wind project on August 5. The UK Planning Inspectorate issued a report of recommendation to the Secretary of State on 5 May 2015. The Secretary of State then issues a decision within the following 3 months. The de

1 minutes read
  • LinkedIn
  • X
  • Email

The UK Energy Secretary is expected to decide on the Dogger Bank Teesside A&B offshore wind project on August 5.

The UK Planning Inspectorate issued a report of recommendation to the Secretary of State on 5 May 2015. The Secretary of State then issues a decision within the following 3 months. The decision letter and report of recommendation will be published by the Planning Inspectorate once a decision has been made.

Dogger Bank Teesside is Forewind’s second stage of development of the Dogger Bank Zone. Originally planned to be four separate wind farms known collectively as Dogger Bank Teesside, this stage has been divided into two separate applications – Dogger Bank Teesside A & B and Dogger Bank Teesside C & D.

Dogger Bank Teesside A & B will comprise two wind farms, each with a maximum installed capacity of 1.2GW, meaning that with a total generating capacity of up to 2.4 GW Dogger Bank Teesside A & B has the potential to generate around 8 Terawatt hours (TWh) of green power every year, which is equivalent to the electricity used annually by approximately two million British homes.

Offshore WIND Staff; Image: Forewind

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

16 days ago