offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›D78 Offshore Wind Blade Leaves NASA for ORE Catapult (VIDEO)
Technology

August 10, 2015 · about 11 years ago

D78 Offshore Wind Blade Leaves NASA for ORE Catapult (VIDEO)

Blade Dynamics is shipping the “D78” advanced assembly blade from its NASA-based facility to be structurally tested at the Offshore Renewable Energy (ORE) Catapult’s blade testing facility at Blyth, UK. This is the only modular offshore blade in the world, the developer pointed out. There are multip

2 minutes read
  • LinkedIn
  • X
  • Email

Blade Dynamics is shipping the “D78” advanced assembly blade from its NASA-based facility to be structurally tested at the Offshore Renewable Energy (ORE) Catapult’s blade testing facility at Blyth, UK.

This is the only modular offshore blade in the world, the developer pointed out.

There are multiple new technologies in the blade including a lightweight and high dimensional accuracy blade tip with built-in leading edge protection. The blade technology has been designed and engineered for simplicity of manufacture to reduce variation and ensure better control of quality.

The modular technology also has significant benefits in the supply chain, simplifies blade transportation, and allows wind turbines to be designed and built to produce an overall lower cost of energy.

The Energy Technology Institute in the UK has supported the development since 2012.

The D78 Blade was partly constructed at Blade Dynamics’ facilities in the UK and the US. In the US, Blade Dynamics operates from the NASA Michoud Assembly Facility, which has 43 acres under one roof.

The overall blade design and the manufacture of the separate blade tip were completed in the UK. The main blade section was assembled and then joined to the tip in the US, before being shipped to the UK for testing.

The completed blade was moved from the NASA assembly facility to the on-site port using transportation equipment designed and last used for the Space Shuttle program.This included the heavy-duty towing equipment last used for towing the Space Shuttle’s main fuel tanks.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago