offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Gemini Foundations Grouted with MasterFlow 9800
Wind Farm Update

August 10, 2015 · about 11 years ago

First Gemini Foundations Grouted with MasterFlow 9800

Only four months after introduction of the new bulk supplied offshore grout MasterFlow 9800 from BASF, the material is being used during the installation of the offshore foundations at the 600 MW Gemini Offshore Windpark. The specialized grouting equipment of FoundOcean and BASF’s MasterFlow 9800 wa

1 minutes read
  • LinkedIn
  • X
  • Email

Only four months after introduction of the new bulk supplied offshore grout MasterFlow 9800 from BASF, the material is being used during the installation of the offshore foundations at the 600 MW Gemini Offshore Windpark.

The specialized grouting equipment of FoundOcean and BASF’s MasterFlow 9800 was mobilized at the harbor of Eemshaven. After installation of the monopiles and transition pieces with Van Oord’s offshore installation vessel Aeolus , the skirts were successfully back-filled using MasterFlow 9800.

The MasterFlow 9800 high-strength grout was mainly chosen because of its unique delivery and installation method, which allows to considerably reduce the offshore grouting time as part of the foundation installation, and being able to work in the shortest weather windows possible, BASF said.

The first 48 of 150 monopiles/transition pieces were already installed and grouted. The monopiles were each grouted within 45 minutes.

Image: Gemini Windpark

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago