offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Elevated Systems Technology Flooring Barrow OWF
Operations & Maintenance

August 13, 2015 · about 11 years ago

Elevated Systems Technology Flooring Barrow OWF

DONG Energy has signed a contract with Barrow-based supplier Elevated Systems Technology (EST) Ltd for new flooring in the offshore substation and the 30 turbines that make up the Barrow offshore wind farm. Work is underway and due to be completed by the beginning of October 2015. The replacement fl

1 minutes read
  • LinkedIn
  • X
  • Email

DONG Energy has signed a contract with Barrow-based supplier Elevated Systems Technology (EST) Ltd for new flooring in the offshore substation and the 30 turbines that make up the Barrow offshore wind farm.

Work is underway and due to be completed by the beginning of October 2015.

The replacement flooring is being supplied by Firbergrate Composite Structure Ltd, based in Stockton on Tees, while the vessel being used to transport both men and materials are based in Barrow-in-Furness, ensuring 100% UK content, DONG Energy highlighted.

David Ducie, Head of Operations at Barrow , said: “DONG Energy is committed to investing in the UK and we always try to source materials from UK based companies whenever we can. It is especially pleasing to find a company that has the expertise to carry out this work right here on our doorstep.”

Barrow offshore wind farm, which has its operational and maintenance base on Barrow Island, comprises 30 turbines with a combined total capacity of 90 megawatts, producing enough power for over 60,000 homes. It has been operational since 2006.

Image: Wikimedia

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago