offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Bladt Completes First Frame for Iberdrola’s OWF Picture
Wind Farm Update

August 19, 2015 · about 11 years ago

Bladt Completes First Frame for Iberdrola’s OWF Picture

First of the total 82 A-frames for Wikinger offshore wind farm foundations is ready for the next step in the fabrication process, Bladt Industries reported via social media. The company will deliver 41 four-legged jacket foundations for Iberdrola’s wind farm in the German part of the Baltic Sea. The

1 minutes read
  • LinkedIn
  • X
  • Email

First of the total 82 A-frames for Wikinger offshore wind farm foundations is ready for the next step in the fabrication process, Bladt Industries reported via social media.

The company will deliver 41 four-legged jacket foundations for Iberdrola’s wind farm in the German part of the Baltic Sea. The jacket foundations will be installed in water depths of up to 42 meters, each with a weight of approximately 600 tons and a footprint of 23×23 meters.

Iberdrola said it will start the in-water construction phase of its Wikinger offshore wind farm in spring 2016.

With a total investment of almost €1.4 billion, Wikinger will comprise 70 turbines with a total capacity of 350MW. Once in operation, the wind farm will be able to produce clean electricity for more than 350,000 German households.

Offshore WIND Staff; Image: Bladt

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago