offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›CWind Signs 3-Year Contract for Gunfleet Sands
Vessels

August 25, 2015 · about 11 years ago

CWind Signs 3-Year Contract for Gunfleet Sands

CWind, a provider of integrated services to the wind industry, has won a 3-year contract to supply crew transfer services during the operations and maintenance (O&M) phase at Gunfleet Sands offshore wind farm (OWF) off the coast of Essex. The CWind Challenger will be transferring technicians and equ

1 minutes read
  • LinkedIn
  • X
  • Email

CWind, a provider of integrated services to the wind industry, has won a 3-year contract to supply crew transfer services during the operations and maintenance (O&M) phase at Gunfleet Sands offshore wind farm (OWF) off the coast of Essex.

The CWind Challenger will be transferring technicians and equipment to the wind farm for the next three years. Gunfleet Sands OWF has the option to extend this contract for up to two years.

CWind Challenger will be operating from Brightlingsea in Essex, which incidentally is where the vessel was built and launched in 2013.

Thomas Engmose, Head of Operations Gunfleet Sands at Dong Energy said: “CWind’s vessels have proven successful at DONG Energy sites on several occasions in the past and their capabilities continue to match our demands. We are keen to have strong local content but from an operations point of view technician safety and comfort, availability on contract and outstanding fleet management are central. Fortunately for us, CWind satisfies on all of those counts.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

11 days ago