offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Siemens Hires Local Firm for Hull Job
Technology

August 25, 2015 · about 11 years ago

Siemens Hires Local Firm for Hull Job

Siemens has hired Neville Tucker Heating to carry out electrical and mechanical building services at offshore wind turbine blade factory on Alexandra Dock. It will install humidity control and air conditioning systems in the 431,000sq ft. factory, and provide services fit-out for its offices. Managi

2 minutes read
  • LinkedIn
  • X
  • Email

Siemens has hired Neville Tucker Heating to carry out electrical and mechanical building services at offshore wind turbine blade factory on Alexandra Dock.

It will install humidity control and air conditioning systems in the 431,000sq ft. factory, and provide services fit-out for its offices.

Managing director Mark Snape said: “It’s great news for our local employment teams – it’s exciting to have a good project local to home.

“It’s good we’ve been recognised as being able to work on this and at the end of the day Hull has got more talent than people give it credit for.

“To be on the ground floor of something like this is fantastic and this project could lead onto bigger and better things for the whole city.”

Neville Tucker was picked to work on the scheme by VolkerFitzpatrick, Siemens’ main contractor.

It will see up to 40 of Mr Snape’s team onsite at any one time, and allow him to create two or three more jobs.

David Sershall, managing director of VolkerFitzpatrick’s building division, said: “We are delighted to have partnered with Neville Tucker on this important and prestigious project for Siemens.

“This contract forms a large part of the works undertaken on site and we are pleased to be able to use a local company to fulfil this requirement as it will see local labour heavily involved in the construction phase of the factory.”

The contractor is aiming to source a quarter of the project’s labour from within a 25-mile radius and create 200 jobs in the region.

The factory will be used to manufacture 75m turbine blades for offshore wind farms.

It also provides space for the assembly, storage and distribution of wind turbine components, and will be complete in autumn 2016.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago