offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›Alnmaritec Commercial Manager Retires
News

September 14, 2015 · about 11 years ago

Alnmaritec Commercial Manager Retires

Alastair Brown, Commercial Manager of Alnmaritec in Blyth, Northumberland, has announced his retirement at the end of his career. With a family background in engineering, Alastair followed in his father’s footsteps to become an engineer, starting his working life as an apprentice draughtsman with Vi

1 minutes read
  • LinkedIn
  • X
  • Email

Alastair Brown, Commercial Manager of Alnmaritec in Blyth, Northumberland, has announced his retirement at the end of his career.

With a family background in engineering, Alastair followed in his father’s footsteps to become an engineer, starting his working life as an apprentice draughtsman with Vickers-Armstrong Shipbuilding and Swan Hunter Shipbuilders in Newcastle.

When he joined Alnmaritec, in 2003, they were on project number 7. They are now completing projects 169 and 170 – and Alastair has been involved in every one of these, from diving boats and small cargo tenders to offshore line-handling and hose-handling vessels and aquaculture boats.

Steve Hardie, Alnmaritec’s Project Manager who has worked with Brown, commented, “He’s a top bloke. I’ve worked with him on and off for 6 years and have learned a lot from him. He’s approachable and very knowledgeable.”

Mark Gulesserian, Managing Director of Alnmaritec, said: “As Alastair retires, he takes with him a wealth of knowledge, experience and contacts which, over the last few months, in a structured and planned way, Alastair has passed on to Gavin Sharp, who is taking over the role of Commercial Manager.”

Image: Alnmaritec

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago