offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Dong Completes Foundation Installation at Gode Wind 1, 2
Wind Farm Update

September 16, 2015 · about 11 years ago

Dong Completes Foundation Installation at Gode Wind 1, 2

At the two offshore wind farms Gode Wind 1 and 2, the last of 97 foundations has been installed. Dong Energy achieved this milestone ahead of schedule due to smooth foundation installation. Altogether, the installation of the 97 monopiles and transition pieces took five months. Trine Borum Bojsen, M

1 minutes read
  • LinkedIn
  • X
  • Email

At the two offshore wind farms Gode Wind 1 and 2, the last of 97 foundations has been installed.

Dong Energy achieved this milestone ahead of schedule due to smooth foundation installation. Altogether, the installation of the 97 monopiles and transition pieces took five months.

Trine Borum Bojsen, Managing Director of DONG Energy in Germany and responsible for the offshore wind activities in the country, said: “It’s a big achievement that we’ve completed this important milestone earlier than planned. I’m happy to say that we’ve installed the foundations within the noise limits imposed by the German authorities.”

In terms of noise mitigation measures, the company used a noise mitigation steel sleeve and a big bubble curtain. The offshore wind farms Gode Wind 1 and 2 are the follow-up projects of DONG Energy in Germany. The first wind project is Borkum Riffgrund 1. The wind farms Gode Wind 1 and 2 will have a total capacity of 582 megawatts. This is sufficient to provide environmentally friendly electricity to 600,000 German households.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago