offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›EnBW Baltic 2 Put into Operation
Wind Farm Update

September 21, 2015 · about 11 years ago

EnBW Baltic 2 Put into Operation

In the presence of the Minister President of Mecklenburg-Vorpommern, Erwin Sellering, and numerous guests from the worlds of business and politics, EnBW Energie Baden-Württemberg AG has officially put its second offshore wind farm in the Baltic Sea into operation. Following a construction period of

2 minutes read
  • LinkedIn
  • X
  • Email

In the presence of the Minister President of Mecklenburg-Vorpommern, Erwin Sellering, and numerous guests from the worlds of business and politics, EnBW Energie Baden-Württemberg AG has officially put its second offshore wind farm in the Baltic Sea into operation.

Following a construction period of around two years, EnBW Baltic 2 with its 80 wind turbines will now generate electricity for around 340,000 households per year.

EnBW Baltic 2 is located 32 kilometres to the north of the island of Rügen. Its 80 wind turbines with a total output of 288 megawatts have been installed over an area of 27 square kilometres. The offshore wind farm will generate 1.2 billion kilowatt hours of electricity per year and cover the aggregate requirements of 340,000 households while saving 900,000 tonnes of carbon dioxide (CO2).

The 80 Siemens SWT-3.6-120 wind turbines rise 138 metres above the surface of the water. Depending on the depth of the water, they have been erected on different foundations: Monopiles have been used for water depths of up to 35 metres, while three-legged jackets have been utilised at depths of over 35 metres.

The substation forms the heart of EnBW Baltic 2. The electricity from the individual wind turbines flows into the substation where it is transformed to a higher voltage and transported to the mainland to be fed into the integrated German electricity network. The yellow substation is 15 metres high, 25 metres long and weighs a total of 4,500 tonnes including the foundations. More than 83 kilometres of undersea cables connect the individual wind turbines to the substation.

Image: EnBW

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

16 days ago