offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›TNEI Completes Studies for ORE Catapult
R&D

October 6, 2015 · about 10 years ago

TNEI Completes Studies for ORE Catapult

TNEI Services have completed a series of studies on behalf of ORE Catapult into Marine Energy Electrical Architectures. Three reports have been produced that take a detailed look at marine energy converter components and how these place constraints on how a multi-device array can be implemented. The

1 minutes read
  • LinkedIn
  • X
  • Email

TNEI Services have completed a series of studies on behalf of ORE Catapult into Marine Energy Electrical Architectures.

Three reports have been produced that take a detailed look at marine energy converter components and how these place constraints on how a multi-device array can be implemented.

The first report consists of a landscape map and a literature review. The second is a review of previous studies on the subject while the third report provides four alternate array architectures that can be deployed depending on the project and device type.

All three reports are available for download on the ORE Catapult .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

26 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago

A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

26 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago
A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago