offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Cable Route Survey Required for VIKING Link
R&D

October 21, 2015 · about 10 years ago

Cable Route Survey Required for VIKING Link

National Grid Interconnector Holdings Limited and Energinet.dk, which are jointly developing a new HVDC power cable between Great Britain and Denmark known as VIKING Link, have invited tenders for a cable route survey extending across the North Sea between the two countries. The cable route survey w

2 minutes read
  • LinkedIn
  • X
  • Email

National Grid Interconnector Holdings Limited and Energinet.dk, which are jointly developing a new HVDC power cable between Great Britain and Denmark known as VIKING Link, have invited tenders for a cable route survey extending across the North Sea between the two countries.

The cable route survey will include geophysical survey, geotechnical investigations, cable-crossing investigations with ROV and Benthic investigations.

Tenderers are invited to submit a response to pre-qualify for the services related to the cable route survey by October 23. The services will include offshore representation on marine vessels as well as onshore support with logistic management and technical consultancy related to the marine operations.

The objectives of the tendered services are to provide offshore representation on the marine vessels on behalf of the developers to monitor progress and performance of the surveyor in terms of Safety, Health, Environment and Quality, breakdown of time, accept/disagree on standby for weather/break-down, technical performance of vessel and measurement systems as well as performance of the crew.

National Grid Interconnector Holdings Limited and Energinet.dk intend to award the work to maximum of two tenderers.

The cable route is approximately 610 km long and 500 m wide. However, this might vary as the final settlement of the route is still ongoing.

The developers require the provision of two offshore client representatives on 24 hr vessels and one offshore client representative on 12 hr vessels. The number of vessels is not settled. The services are expected to be delivered and completed in 2016.

Image: Energinet.dk

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago

A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

26 days ago
A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 7 months ago