offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›MMT Wins Kriegers Flak Survey Job
Grid Connection

November 2, 2015 · about 10 years ago

MMT Wins Kriegers Flak Survey Job

Energinet.dk has awarded a survey job for Kriegers Flak project to MMT. The Swedish company will undertake a geophysical and geotechnical survey of a 26 km long cable route corridor. As part of the Kriegers Flak Combined Grid Solution the Danish TSO Energinet.dk and the German TSO 50Hertz Transmissi

1 minutes read
  • LinkedIn
  • X
  • Email

Energinet.dk has awarded a survey job for Kriegers Flak project to MMT.

The Swedish company will undertake a geophysical and geotechnical survey of a 26 km long cable route corridor.

As part of the Kriegers Flak Combined Grid Solution the Danish TSO Energinet.dk and the German TSO 50Hertz Transmission GmbH is preparing the installation of 2 parallel HVDC cables from the KFBE substation at the planned Kriegers Flak Wind Farm (DK) to the Baltic 2 substation at the Baltic 2 Wind Farm (DE).

Kriegers Flak Combined Grid Solution is the world’s first offshore interconnection that is using the national grid connections to offshore wind-farms in the Baltic Sea.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

28 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

18 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

20 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

28 days ago