offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›Subhub Installed and Retrieved in Real Tidal Conditions
Technology

November 16, 2015 · about 10 years ago

Subhub Installed and Retrieved in Real Tidal Conditions

QED Naval has reported that it completed installation and retrieval trials of the Subhub operations model in real tidal conditions. The company said it installed the model on the seabed in a controlled manner within minutes and then secured it on the seabed overnight, before being recovered to the s

1 minutes read
  • LinkedIn
  • X
  • Email

QED Naval has reported that it completed installation and retrieval trials of the Subhub operations model in real tidal conditions.

The company said it installed the model on the seabed in a controlled manner within minutes and then secured it on the seabed overnight, before being recovered to the surface within an equally short time period and control.

“Scaling these extreme conditions to the prototype size, based on a 4.0m diameter turbine, would be equivalent to over 2m/s or 4 knots with a significant wave heights over 1.0m,” the company explained.

Frontal profiles of turbine blades were added to the cross beam to simulate three turbines being installed on the Subhub; the blades acting against the current presented no issues, QED Naval said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Floating Wind Test Site Offshore Spain Gets Regulatory Nod
Authorities

Floating Wind Test Site Offshore Spain Gets Regulatory Nod

25 days ago
New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

25 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago