offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Apollo Getting Ready for Boom Lock
Business & Finance

November 17, 2015 · about 10 years ago

Apollo Getting Ready for Boom Lock

Belgium-based High Wind has announced that GeoSea’s new jack-up vessel Apollo will be prepared for the Boom Lock system which allows an offshore crane to install wind turbine components at high wind speeds. High Wind will manage all elements of the design and engineering in cooperation with GeoSea,

2 minutes read
  • LinkedIn
  • X
  • Email

Belgium-based High Wind has announced that GeoSea’s new jack-up vessel Apollo will be prepared for the Boom Lock system which allows an offshore crane to install wind turbine components at high wind speeds.

High Wind will manage all elements of the design and engineering in cooperation with GeoSea, an offshore marine engineering project specialist and part of DEME Group, and the crane manufacturer.

The Boom Lock is designed to control the movement of the crane hook and the payload in such a way ” that installation time can be drastically reduced,” according to High Wind.

The system is also expected to increase safety during the installation of the wind turbines by reducing uncontrolled movements in windy conditions.

Ole Jacob Wang Nielsen, Head of Business Development of High Wind, said: “We are honoured to have been trusted by GeoSea to prepare their newest jackup vessel Apollo for the Boom Lock system. With the system installed, the Apollo will be capable of safer and more efficient installation of turbines and blades in higher wind speeds.”

The Boom Lock is currently in use on GeoSea’s jack-up vessel Neptune.

“There is a large potential for the industry in reducing costs by increasing workability offshore. As the turbines and blades grow in size, the weather limits and controllability during lifting operations will decrease, unless we introduce smart solutions” said Bart De Poorter, General Manager of GeoSea.

“High Wind offers an integrated tagline and guidance system and we see this as an important and necessary upgrade from current industry practice.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceOperations & MaintenanceTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago