offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›6 Alpha, Atkins to Manage UXO Risk at 3 UK OWFs
News

November 18, 2015 · about 10 years ago

6 Alpha, Atkins to Manage UXO Risk at 3 UK OWFs

6 Alpha Associates has partnered with Atkins to provide offshore unexploded ordnance (UXO) risk assessment ahead of the geotechnical surveys prior to the construction of three UK offshore wind farms. The two companies will deliver UXO risk management services for the geotechnical ground investigatio

2 minutes read
  • LinkedIn
  • X
  • Email

6 Alpha Associates has partnered with Atkins to provide offshore unexploded ordnance (UXO) risk assessment ahead of the geotechnical surveys prior to the construction of three UK offshore wind farms.

The two companies will deliver UXO risk management services for the geotechnical ground investigations undertaken at the designated turbine locations, as well as along the export cable routes for the Galloper, Rampion and Triton Knoll offshore wind projects.

Prior to specifying the geophysical surveys, 6 Alpha Associates prepared desktop study reports to ascertain the level of initial UXO risk.

Once the absence of UXO had been confirmed by interpretation of the geophysical surveys, 6 Alpha Associates awarded Safety Sign Off Certificates – with the most recent to Triton Knoll being delivered in August this year – to confirm that the risk of UXO had been reduced to ‘as low as reasonably practicable’ (ALARP) and that geotechnical vessels could carry out exploratory boreholes.

Simon Cooke, Managing Director, 6 Alpha Associates , said: “By working with Atkins during the preliminary stages of offshore wind construction, we can ensure that the possibility of extensive and costly delays related to the discovery of UXO on site at a later date, is avoided.”

Giorgio Maderni, Chief Geotechnical Engineer, Atkins , said: “Through our partnership with 6 Alpha we can offer our clients an integrated design and investigation team which can minimise risks in a highly cost effective manner for offshore wind developers.”

Image: MAST/Illustration

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago