offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Mojo Adds Technical Breakdown Modelling Feature to Mermaid
Operations & Maintenance

November 24, 2015 · about 10 years ago

Mojo Adds Technical Breakdown Modelling Feature to Mermaid

Mojo Maritime has added a new feature to its marine operations planning and weather risk analysis tool, Mermaid, allowing it to address technical breakdown on marine operations. Mojo Maritime, a subsidiary of James Fisher and Sons, says that Mermaid now allows the modelling of the breakdown of criti

1 minutes read
  • LinkedIn
  • X
  • Email

Mojo Maritime has added a new feature to its marine operations planning and weather risk analysis tool, Mermaid, allowing it to address technical breakdown on marine operations.

Mojo Maritime, a subsidiary of James Fisher and Sons, says that Mermaid now allows the modelling of the breakdown of critical components and their repair process, in a predictable and deterministic way.

When repairs require a return to port, Mermaid harnesses its geographic awareness to automatically schedule the transits, and where repairs are a complex operation requiring certain weather limits to be met, the tool utilises its metocean awareness to ensure that the repair can be completed.

In case when repairs are a sophisticated series of operations, Mermaid uses its nested grouping and repeating capabilities to allow realistic modelling of the situation, and where replacement components are on a lead time, or require transport from a distance, Mermaid uses its ability to model multiple vessels and ports to provide a realistic and weathered component delivery time.

“Weather is a critical and difficult-to-control risk on marine operations; and for many years, Mermaid® has been providing us with accurate measurement of this risk,” said Dr Rich Walker, Mojo’s Senior Marine Operations Analyst.

“With this latest development, Mermaid® can now report on the impact of technical breakdown. As it integrates seamlessly with the measurement of weather risk, I believe that this adds unrivalled sophistication to our risk analysis capabilities.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnologyVessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago