offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Eastern Scheldt Tidal Plant Goes Live
Operations & Maintenance

November 26, 2015 · about 10 years ago

Eastern Scheldt Tidal Plant Goes Live

The tidal power plant in the Dutch Eastern Scheldt surge barrier was put into service on Wednesday, 25 November, heavy construction equipment maker Huisman said. The festive commissioning of the largest tidal energy project in the Netherlands, as well as the world’s largest commercial tidal installa

2 minutes read
  • LinkedIn
  • X
  • Email

The tidal power plant in the Dutch Eastern Scheldt surge barrier was put into service on Wednesday, 25 November, heavy construction equipment maker Huisman said.

The festive commissioning of the largest tidal energy project in the Netherlands, as well as the world’s largest commercial tidal installation of five turbines in an array, was performed by Diederik Samson, Group Chairman of the Dutch Labour Party.

“This project marks an important step in the development of tidal energy. Tidal technology is innovative and could grow into a significant Dutch export product. The export expectation of tidal energy is more than 200 Gigawatt. With our turbines in the Eastern Scheldt storm surge barrier, we can now show the world what tidal energy is all about: providing a clean and reliable source of energy that could fulfill 10-20% of the world’s electricity needs,” said Hans van Breugel, CEO of Tocardo, producer of the tidal power plant.

Besides Tocardo and Huisman, a number of other Dutch companies were involved in this project. Strukton has been actively involved in the project planning and was fully responsible for project management during installation. Mammoet’s involvement in the project comprises the transportation and installation of the Tidal Power Plant at the Eastern Scheldt storm surge barrier. The local companies Istimewa Elektrotechniek, Van der Straaten and Hillebrand also played a role in terms of the electro-technical installation and steel structures.

The province of Zeeland has provided a significant financial contribution to the project.

“Zeeland is surrounded by water. We are the only province in the Netherlands with land in the sea, which is why tidal energy is such a good match for us. In recent years we have built up much expertise in this area. We are a pioneer and now we can show that the water is an important energy source for Zeeland. Tidal energy is the future, of that I am convinced,” provincial representative Ben de Reu said.

This project also received funding from the European Regional Development Fund, the Dutch government and the province of Zeeland as part of the Operational Programme for Zuid-Nederland (OP-Zuid).

Image: Huisman

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago