offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Geophysical Investigations Required for Hollandse Kust Zuid
Authorities

December 18, 2015 · about 10 years ago

Geophysical Investigations Required for Hollandse Kust Zuid

The Dutch Ministry of Economic Affairs has invited tenders for geophysical soil investigations at the Hollandse Kust Zuid (South) offshore wind farm zone. An agreement will be signed with a tenderer who is able to carry out the geophysical investigations required to obtain the soil information at th

1 minutes read
  • LinkedIn
  • X
  • Email

The Dutch Ministry of Economic Affairs has invited tenders for geophysical soil investigations at the Hollandse Kust Zuid (South) offshore wind farm zone.

An agreement will be signed with a tenderer who is able to carry out the geophysical investigations required to obtain the soil information at the offshore wind farm zones at Hollandse Kust Zuid, in the Dutch part of the North Sea.

Bids can be submitted by 15 January, 2016.

The soil information will be made available to the participants in the SDE+ concession tenders for offshore wind farm zones in the Netherlands. The SDE+ (Stimulering Duurzame Energieproductie/Stimulation of sustainable energy production) is an operating grant which encourages the production of renewable energy in the Netherlands.

The Netherlands has six offshore wind sites in the pipeline at two Hollandse Kust zones: four at Hollandse Kust Zuid, and two at Hollandse Kust Noord.

Each of the sites at the wind farm zones can accommodate 350 MW. TenneT will build grid connections and construct offshore substations.

The subsidy and permit tender for sites Hollandse Kust Zuid I & II is planned to open in 2017, and Hollandse Kust Noord is scheduled for the process in 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesR&DWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
France Reveals Normandy Offshore Wind Tender Finalists
Authorities

European Commission Greenlights France’s EUR 63 Billion Aid Scheme to Build 11 Offshore Wind Farms

17 days ago