offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Cowi to Design India’s First Offshore Wind Farm
Authorities

December 21, 2015 · about 10 years ago

Cowi to Design India’s First Offshore Wind Farm

Danish consultancy Cowi has won a contract to design India’s first offshore wind farm and to head capacity building within the Indian authorities, including preparation of an offshore wind policy. ​The wind farm is to be located off the coast of Gujarat in northwestern India. The size of the demonst

2 minutes read
  • LinkedIn
  • X
  • Email

Danish consultancy Cowi has won a contract to design India’s first offshore wind farm and to head capacity building within the Indian authorities, including preparation of an offshore wind policy.

​The wind farm is to be located off the coast of Gujarat in northwestern India. The size of the demonstration project has not yet been finally determined, but the Indian government is very ambitious, Cowi said in a statement.

In addition to planning and design, Cowi will assist in determining the size of subsidies, electricity costs, connection to the power grid, etc. The consultancy will also help the authorities build an offshore wind knowledge bank.

Consultancy and engineering competencies in planning and design will include electrical design, conceptual design of the foundation based on geotechnical studies and metocean analyses, as well as the layout of the wind farm.

The project is financially backed by the European Union. Furthermore, the UK government has just entered into a cooperation agreement with India that also includes development of offshore wind facilities, Cowi says.

The planning phase will take three and a half years. After that, the project is to be put out to tender and the new policy implemented. The project is expected to be completed in 2019.

“India’s government is hugely ambitious, and from a supply and climate perspective, it needs to come up with new renewable energy technologies. India has the capacity and the will needed to develop and establish an offshore wind industry. We’re planning to design a farm generating somewhere in the range of 50 megawatt,” said Marc Normann, Market Director of Industry and Energy at Cowi.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesBusiness & FinanceR&DTraining & EducationWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago