offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›WindMW Refinances Meerwind
Business & Finance

December 22, 2015 · about 10 years ago

WindMW Refinances Meerwind

WindMW, the company behind the Meerwind offshore wind farm, has issued a EUR 978 million in bonds to refinance an existing bank debt for the construction of the 288MW offshore wind project. The bonds were issued on 17 December 2015 to a group of around 20 international institutional investors and be

1 minutes read
  • LinkedIn
  • X
  • Email

WindMW, the company behind the Meerwind offshore wind farm, has issued a EUR 978 million in bonds to refinance an existing bank debt for the construction of the 288MW offshore wind project.

The bonds were issued on 17 December 2015 to a group of around 20 international institutional investors and benefit from investment grade ratings from the three main rating agencies. Proceeds are mainly used to close the existing bank debt of around EUR 850 million, which was raised in August 2011 to finance the construction of Meerwind.

The project, which consists of two wind farms – Meerwind Süd and Meerwind Ost, is one of the first commercial offshore wind farms in operation in Germany. Meerwind comprises 80 Siemens 3.6MW wind turbines installed in the German Bight in the North Sea, 23km north of the island of Helgoland.

With the news about project refinancing, Green Giraffe reported that it helped WindMW to benchmark the proposed bond option against a restructuring of the existing bank debt. The specialist advisory company also acted as financial advisor to WindMW in 2011 and helped raise EUR 869 million in long term construction facilities. After financial close, Green Giraffe assisted WindMW in liaising with and reporting to the lending group throughout construction, which was formally completed in September 2015.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago