offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›Ingeteam Looking Into O&M Cost Cuts
Authorities

December 30, 2015 · about 10 years ago

Ingeteam Looking Into O&M Cost Cuts

O&M services provider Ingeteam Service has been chosen to lead the Nidaros R&D project awarded by Spain’s Ministry of Economy and Competitiveness and directed at increasing the competitiveness of offshore wind power. In collaboration with the Tecnalia technology centre, the Nidaros project is expect

1 minutes read
  • LinkedIn
  • X
  • Email

O&M services provider Ingeteam Service has been chosen to lead the Nidaros R&D project awarded by Spain’s Ministry of Economy and Competitiveness and directed at increasing the competitiveness of offshore wind power.

In collaboration with the Tecnalia technology centre, the Nidaros project is expected to lead to a reduction in offshore operating costs through improvements in maintenance management.

The Nidaros is to develop a new engineering tool, maintenance procedures and monitoring technologies for the implementation of advanced maintenance strategies for energy generating devices of this type. The initial results are set to be presented at the end of 2016.

This is the third R&D offshore project Ingeteam Service has been involved in since 2013.

One of these projects is Optimus, funded by the European Union and directed at increasing wind turbine reliability levels. Ingeteam says that the project’s initial results show a ”successful implementation of the new maintenance strategies based on condition monitoring methodologies.”

Ingeteam Service has also taken part in Suprapower, a project directed at offering advanced industrial solutions for deep-sea wind turbines through a 10 MW offshore wind turbine design based on a superconducting (SC) generator.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesOperations & MaintenanceR&DTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

16 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago