offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Longyuan Power Hooks Up First Four Turbines off Nanri Island
Grid Connection

January 5, 2016 · about 10 years ago

Longyuan Power Hooks Up First Four Turbines off Nanri Island

Chinese utility Longyuan Power Group Corp connected to the grid the first four wind turbines at the 400MW Longyuan Putian Nanri Island wind farm on December 21, the company’s parent said in a release. The four 4MW Siemens SWT-4.0-130 wind turbines are situated in the waters off the city of Putian, F

1 minutes read
  • LinkedIn
  • X
  • Email

Chinese utility Longyuan Power Group Corp connected to the grid the first four wind turbines at the 400MW Longyuan Putian Nanri Island wind farm on December 21, the company’s parent said in a release.

The four 4MW Siemens SWT-4.0-130 wind turbines are situated in the waters off the city of Putian, Fujian Province, China Guodian Corp said in the statement.

Once completed in 2018, the wind farm will comprise one hundred 4MW Siemens SWT-4.0-130 turbines. The construction of the wind farm is expected to cost around CNY 8.2 billion (EUR 1.18bn).

The state-owned Longyuan will provide 70% of funds needed for the construction, with Jiangyin Sulong Heat and Power Generating Company covering the remaining 30%.

The wind farm is expected to have the capacity to produce 1.4 billion kilowatt hours of electricity annually.

Offshore WIND Staff

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionOperations & MaintenanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago

OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

14 days ago
OWC, KLEM, and OEG Form Korean Offshore Wind Pact
Operations & Maintenance

OWC, KLEM, and OEG Form Korean Offshore Wind Pact

14 days ago