offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ezion to Market Two China-Built Service Rigs
Business & Finance

January 13, 2016 · about 10 years ago

Ezion to Market Two China-Built Service Rigs

Singapore-based liftboats and service rigs provider Ezion Holdings Limited has secured an agreement to jointly market two service rigs being built by an undisclosed Chinese state-owned enterprise for offshore wind power installation projects. Ezion will also provide the technical expertise for the o

1 minutes read
  • LinkedIn
  • X
  • Email

Singapore-based liftboats and service rigs provider Ezion Holdings Limited has secured an agreement to jointly market two service rigs being built by an undisclosed Chinese state-owned enterprise for offshore wind power installation projects.

Ezion will also provide the technical expertise for the operations and deployment of the two service rigs, and has been granted options to buy them.

Back in December 2015, Ezion agreed to provide another Chinese state-owned enterprise with service rigs for the loading, construction, transportation and installation aspects of a wind turbine development project undertaken by the enterprise.

In addition, Ezion will also be providing the relevant technical expertise required for the construction and installation of the wind turbine foundation and components.

The enterprise will be responsible for the engineering, procurement and construction of the entire offshore wind power project which includes the design optimization, manufacturing, transportation and installation of the wind turbine foundation for offshore wind power, as well as the installation of the turbine and substation, cable laying and the operations and maintenance of the wind farm.

China has set a target of 30GW of installed offshore wind capacity by 2020 in its current five-year plan.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

15 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

16 days ago