offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Siemens Receives €170M COBRAcable Order
Grid Connection

February 1, 2016 · about 10 years ago

Siemens Receives €170M COBRAcable Order

Siemens has been awarded an order for COBRAcable, a link between the Dutch and Danish power grids, by Danish power grid service provider Energinet.dk and its Dutch counterpart TenneT TSO. Siemens will supply two HVDC converter stations at both sides of the DC power line, which will be routed as a su

2 minutes read
  • LinkedIn
  • X
  • Email

Siemens has been awarded an order for COBRAcable, a link between the Dutch and Danish power grids, by Danish power grid service provider Energinet.dk and its Dutch counterpart TenneT TSO.

Siemens will supply two HVDC converter stations at both sides of the DC power line, which will be routed as a subsea cable through the North Sea. The cable will be supplied by the Italian company Prysmian

The scope of the order covers two 700 MW converter stations for a DC voltage of ±320 Kilovolt (kV). The two converter stations, one at Eemhaven in Holland, the other in Endrup in Denmark, will be linked by a 325-kilometer long DC power cable.

Energinet.dk will be responsible for all the construction work in Endrup for erecting the building to house the Siemens converter equipment at that station. Siemens will supply the turn-key converter station in Eemshaven.

The scope of the order includes the system design and the supply, installation and commissioning of all components. The volume of Siemens’ share of the order is around EUR 170 million.

The COBRAcable HVDC link has been designated as one of the European Commission’s projects of common interest to help create an integrated European Union energy market. The construction of COBRAcable is scheduled to start this year and the link is expected to take up commercial operation at the beginning of 2019.

TenneT CEO Mel Kroon commented: “One main purpose of the COBRA cable is to promote competition in the Northwest European energy market, which will ultimately benefit consumers. Because we are directly linking the Dutch and Danish power grids, the security of supply for businesses and consumers in both countries will also increase. Plus the Netherlands will be able to import more renewable electricity, generated mainly by Danish wind turbine farms.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

21 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

28 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

21 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

28 days ago