offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Gode Wind 1 and 2 Turbines Installation Halfway Done
Vessels

February 5, 2016 · about 10 years ago

Gode Wind 1 and 2 Turbines Installation Halfway Done

A2SEA’s self-propelled jack-up vessel Sea Challenger has completed the installation of the 49th turbine at the 582 MW Gode Wind 1 and 2 offshore wind farm, marking and surpassing the halfway stage in the process. When completed, Gode Wind 1 and 2 will comprise 97 6 MW Siemens Wind Power turbines, ma

1 minutes read
  • LinkedIn
  • X
  • Email

A2SEA’s self-propelled jack-up vessel Sea Challenger has completed the installation of the 49th turbine at the 582 MW Gode Wind 1 and 2 offshore wind farm, marking and surpassing the halfway stage in the process.

When completed, Gode Wind 1 and 2 will comprise 97 6 MW Siemens Wind Power turbines, making it the largest contiguous offshore wind farm in Germany to date.

“This a great achievement. On behalf of the project team, I would like to thank our crew, DONG Energy and Siemens Wind Power for great cooperation and performance despite installation in challenging weather during winter season. We are looking forward to continue this partnership for the remaining installation period,” said Project Manager Thomas Sandberg.

The wind farm is owned by DONG Energy and is expected to be fully commissioned in the second half of 2016.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago