offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›BLG Signs 30-Year Deal to Operate Offshore Terminal Bremerhaven
News

February 8, 2016 · about 10 years ago

BLG Signs 30-Year Deal to Operate Offshore Terminal Bremerhaven

Representatives of BLG Logistics and bremenports GmbH & Co. KG have signed an agreement for the operation of the 25-hectare offshore Terminal Bremerhaven (OTB). BLG Logistics will operate the OTB for 30 years. The contract is signed as a concession that allows the company to operate the port facilit

1 minutes read
  • LinkedIn
  • X
  • Email

Representatives of BLG Logistics and bremenports GmbH & Co. KG have signed an agreement for the operation of the 25-hectare offshore Terminal Bremerhaven (OTB).

BLG Logistics will operate the OTB for 30 years. The contract is signed as a concession that allows the company to operate the port facility at its own expense and risk. The operator is obliged to pay a fee to the Federal Land of Bremen for the use of the terminal.

Work on the OTB began at the end of 2015. In January 2016, the terrain around the airport was cleared. By the end of April, an ordnance survey and clearance will be carried out.

The facility for pre-assembly and handling of offshore wind turbines will be available from 2019.

“The OTB ensures close cooperation between industrial production and shipping. It will significantly strengthen the offshore location Bremerhaven. At the same time it will make an important contribution to the successful implementation of the national energy policy because it will reduce the high logistics costs that are connected with the production of energy from offshore wind power,” said Ekkehart Siering , Bremen’s State Councillor for Economics, Labour and Ports.

With a total cost of EUR 180 million, the terminal is one of the largest infrastructure projects carried out in Bremen in the last decade.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago