offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Siemens Enters Final Stretch at Westermeerwind
Wind Farm Update

February 10, 2016 · about 10 years ago

Siemens Enters Final Stretch at Westermeerwind

Siemens has fully installed 32 out of the 48 wind turbines at the 144 MW Westermeerwind Wind Farm. Westermeerwind is being built in the waters of the IJsselmeer, along the dikes of the Noordoostpolder. It is the largest near shore wind farm in the Netherlands. The turbines are divided into two rows

1 minutes read
  • LinkedIn
  • X
  • Email

Siemens has fully installed 32 out of the 48 wind turbines at the 144 MW Westermeerwind Wind Farm.

Westermeerwind is being built in the waters of the IJsselmeer, along the dikes of the Noordoostpolder. It is the largest near shore wind farm in the Netherlands.

The turbines are divided into two rows along the Westermeer dike and one row along the Noordermeer dike, and are connected to an onshore transformer station .

Following the full completion expected by the end of spring 2016, the Westermeerwind will start generating enough power to meet the demands of 160,000 households.

Siemens started installing the 3 MW turbines at the site in August 2015. The wind farm produced its first power in November 2015.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago