offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›GEV Tackles Blade Damage During Transit
News

February 18, 2016 · about 10 years ago

GEV Tackles Blade Damage During Transit

GEV Wind Power has developed a ‘factory to site’ Quality Assurance Programme to tackle the risk of wind turbine blades and generators being damaged during the transit. Over 90% of turbine blades are damaged to some degree in transit, GEV said, and with the new service, the company’s technicians will

1 minutes read
  • LinkedIn
  • X
  • Email

GEV Wind Power has developed a ‘factory to site’ Quality Assurance Programme to tackle the risk of wind turbine blades and generators being damaged during the transit.

Over 90% of turbine blades are damaged to some degree in transit, GEV said, and with the new service, the company’s technicians will inspect and monitor wind turbine blades for transit damage during the whole process from fabrication to installation.

Steve Ross , Managing Director of GEV Wind Power, said: “The process involves carrying out QA inspections on newly fabricated blades, which once inspected and signed off are transferred to site. On arrival, our technicians will inspect for transportation damage, which if evident, can be repaired instantly onsite. The blades will then be certified and given the quality assurance all clear.”

As part of the quality assurance mapping process after construction, all wind turbine generators will all also be inspected using the GEV Wind Power Panoblade camera system.

“This is a very exciting innovation for the industry and ensures that at every stage of the process from blade manufacture to installation and commissioning, rigorous quality checks are undertaken and opportunities to rectify damage are factored in,” Ross added. “This new service also provides clients with accurate and detailed information should they need to seek recourse for damage or repairs.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Brings Maritime Expertise and Careers Focus to Southampton
News

Seawork Brings Maritime Expertise and Careers Focus to Southampton

about 1 month ago
Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago