offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›CT Offshore Wraps Up Gode Wind Inter-Array Cabling
Wind Farm Update

February 26, 2016 · about 10 years ago

CT Offshore Wraps Up Gode Wind Inter-Array Cabling

CT Offshore today installed the last inter-array cable on DONG Energy’s Gode Wind 1+2 Offshore Wind Farm in the German part of the North Sea. “Gode Wind is the largest project to date for CT Offshore and it is a great achievement that our project team and offshore crew have now completed the install

1 minutes read
  • LinkedIn
  • X
  • Email

CT Offshore today installed the last inter-array cable on DONG Energy’s Gode Wind 1+2 Offshore Wind Farm in the German part of the North Sea.

“Gode Wind is the largest project to date for CT Offshore and it is a great achievement that our project team and offshore crew have now completed the installation of the 97 inter-array cables. We can all be very satisfied,” said Jens Frederik Hansen , Chairman at CT Offshore.

Cables were buried by the new purpose-built subsea trencher ROV, the CTO 107-1100, which has an operating depth of 100 metres, with an option of up to 1,500 metres.

The Gode Wind 1 and 2 Offshore Wind Farm has a capacity of 582MW, and will provide green energy to approx. 600.000 German households when fully commissioned.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

17 days ago