offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Planning Inspectorate Contemplating Triton Knoll Wire
Grid Connection

March 7, 2016 · about 10 years ago

Planning Inspectorate Contemplating Triton Knoll Wire

The examination period for the proposed electrical infrastructure for the Triton Knoll offshore wind farm closed on 3 March, the UK Planning Inspectorate (PINS) reported, and the proposal is now in a decision stage. There will now be a period of 3 months for the Examining Authority to consider and m

1 minutes read
  • LinkedIn
  • X
  • Email

The examination period for the proposed electrical infrastructure for the Triton Knoll offshore wind farm closed on 3 March, the UK Planning Inspectorate (PINS) reported, and the proposal is now in a decision stage.

There will now be a period of 3 months for the Examining Authority to consider and make a recommendation to the Secretary of State, who will also have a further 3 months to make the decision.

Triton Knoll Offshore Wind Farm submitted an application for a Development Consent Order (DCO) for the Triton Knoll Electrical System in April 2015.

As a result of responses to statutory consultation on the electrical system in 2014 and discussions with stakeholders, a number of changes have been made to the project.

Located approximately 32 kilometres off the coast of Lincolnshire, the Triton Knoll wind farm will comprise up to 288 turbines with total capacity of up to 900MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

14 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago