offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›GE Starts Tower Assembly for Block Island Turbines
Business & Finance

March 18, 2016 · about 10 years ago

GE Starts Tower Assembly for Block Island Turbines

General Electric (GE) is today officially kicking off the assembly of the towers for the wind turbines to be installed at the 30MW Block Island Wind Farm, the first offshore wind farm in the United States. Built by Deepwater Wind and located three miles the coast of Block Island, Rhode Island, the w

1 minutes read
  • LinkedIn
  • X
  • Email

General Electric (GE) is today officially kicking off the assembly of the towers for the wind turbines to be installed at the 30MW Block Island Wind Farm, the first offshore wind farm in the United States.

Built by Deepwater Wind and located three miles the coast of Block Island, Rhode Island, the wind farm is scheduled to come online at the end of 2016 and generate 125,000 megawatt-hours of electricity. That’s enough to meet 90 percent of Block Island’s power needs.

GE will today celebrate the milestone at a plant in the Port of Providence, where it will assemble the towers for the wind turbines.

Rhode Island Governor Gina Raimondo, Deepwater CEO Jeffrey Grybowski and Anders Soe-Jensen, CEO of GE Renewable Energy’s Offshore Wind Activity, will be present.

The wind farm will use five Haliade 150-6MW wind turbines, which GE acquired with Alstom last fall and manufactures inside a new plant at the mouth of the Loire River in Saint-Nazaire, France. The first tower sections arrived at the Port of Providence in November 2015.

The first Haliade produced by GE has recently left the factory for Denmark, where it will be installed on the Osterild site operated by the utility EDF EN.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago