offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tenders Invited for EW Baltica-3 Study
Business & Finance

April 1, 2016 · about 10 years ago

Tenders Invited for EW Baltica-3 Study

Polish wind farm developer PGE Energia Odnawialna S.A. has invited tenders for a study on the EW Baltica-3 offshore wind farm project. The project is located in the Polish Exclusive Economic Zone of the Baltic Sea, some 33km off the coast at the border of Slupsk Bank. The aim of the study is to cond

1 minutes read
  • LinkedIn
  • X
  • Email

Polish wind farm developer PGE Energia Odnawialna S.A. has invited tenders for a study on the EW Baltica-3 offshore wind farm project.

The project is located in the Polish Exclusive Economic Zone of the Baltic Sea, some 33km off the coast at the border of Slupsk Bank.

The aim of the study is to conduct a two-year campaign of measurement of wind conditions in the Baltic Sea and the acquisition of wind data, collected using a special floating platform equipped with a LiDAR device.

The project includes a study of the vertical profile of wind speed and direction, a study of waves and sea currents, measurement of air and water temperature, barometric pressure and relative humidity, as well as preparation of reports summarizing the collected results.

The value of the contract is EUR 414,000, and the time-frame for the completion and submission of the study is 30 months.

Interested parties have until 27 April to submit their bids. The language to be used is Polish.

Back in September 2015, PGE Energia Odnawialna kicked off an environmental survey process for its Baltica 2 and 3 projects. The company had earlier received connection conditions and signed an interconnection agreement for 1,045.5MW.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceContracts & TendersR&DTechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago