offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Rentel Orders ABB Cable System
Business & Finance

April 5, 2016 · about 10 years ago

Rentel Orders ABB Cable System

ABB has won an order worth around USD 80 million from Rentel NV in Belgium to deliver an advanced cable system that will connect the offshore substation at the 309MW Rentel wind farm located off the Belgian coastline to the mainland close to Zeebrugge. ABB will design, manufacture and install the ap

1 minutes read
  • LinkedIn
  • X
  • Email

ABB has won an order worth around USD 80 million from Rentel NV in Belgium to deliver an advanced cable system that will connect the offshore substation at the 309MW Rentel wind farm located off the Belgian coastline to the mainland close to Zeebrugge.

ABB will design, manufacture and install the approximately 40 kilometer long extruded three-core 220-kilovolt alternating current (AC) submarine cable system which will have a transmission capacity of around 300MW. The project is scheduled to be commissioned in 2018.

“The Rentel windfarm cable link will help bring clean wind power to the people of Belgium” said Claudio Facchin, president of ABB’s Power Grids division.

“It is another example of ABB technologies that enable the integration of renewable energy and lower the environmental impact, which is an integral element of the company’s Next Level strategy.”

Rentel has recently awarded the contract for the wind farm’s offshore substation to STX France SA.

Contracts for the supply and installation of the 42 wind turbines and foundations are set to be finalised shortly, with Siemens being the preferred supplier for the wind turbines.

Rentel aims to complete the project financing for this EUR 1.25 billion investment by the summer of 2016 in order to immediately start the construction works. The new wind farm is expected to start generating power as of mid-2018.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & FinanceGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

15 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

16 days ago