offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›First Made-in-USA Offshore Wind Service Vessel Delivered
Operations & Maintenance

April 11, 2016 · about 10 years ago

First Made-in-USA Offshore Wind Service Vessel Delivered

Atlantic Pioneer, the first US-built offshore wind service vessel, was delivered to Atlantic Wind Transfers over the last weekend. The 21-meter crew transfer vessel was built by the Rhode Island-based Blount Boats to service a 20-year crew transfer contract with Deepwater Wind for its 30MW Block Isl

1 minutes read
  • LinkedIn
  • X
  • Email

Atlantic Pioneer, the first US-built offshore wind service vessel, was delivered to Atlantic Wind Transfers over the last weekend.

The 21-meter crew transfer vessel was built by the Rhode Island-based Blount Boats to service a 20-year crew transfer contract with Deepwater Wind for its 30MW Block Island offshore wind farm.

During the ceremony, Atlantic Pioneer crossed paths with the Big Max cable installation vessel in Quonset Davisville Piers. The Big Max will begin laying the undersea cable from Block island to the offshore wind platforms in the coming weeks, Rhode Island Fast Ferry, the parent company of Atlantic Wind Transfers, said.

Atlantic Wind Transfers, the first US offshore wind farm support company, invested over USD 4 million to build the vessel, expected to enter service in May 2016.

The company will also provide crew and equipment support during the construction phase of the Block Island OWF.

Following completion of the five-turbine site, work will move into operations and maintenance support, to encompass a scheduled maintenance program as well as any additional crew transfer support required throughout the 20-year life cycle of the first US offshore wind farm project.

Images: Rhode Island Fast Ferry

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenanceVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago