offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Offshore Wind: A Playfield with Giant Toys (Photo Gallery)
Vessels

April 20, 2016 · about 10 years ago

Offshore Wind: A Playfield with Giant Toys (Photo Gallery)

The story of offshore wind farms moving farther from shore and wind turbines being installed in deeper waters does not finish with gigantic vessels and foundations, but extends to the almost entire supply chain, where equipment is also getting bigger and services are being adapted to the industry’s

2 minutes read
  • LinkedIn
  • X
  • Email

The story of offshore wind farms moving farther from shore and wind turbines being installed in deeper waters does not finish with gigantic vessels and foundations, but extends to the almost entire supply chain, where equipment is also getting bigger and services are being adapted to the industry’s needs.

At the beginning of this month, the world’s largest wind installation vessel – Seajacks Scylla – started installing the world’s heaviest monopiles at the Veja Mate offshore wind site. On top of that, the project is utilizing the largest hydraulic impact hammer, which has a strike power of 4,000kJ.

Wagenborg Projects & Logistics recently handled and transported one IHC IQIP’s S-4000 Hydrohammer from IHC’s production hall to IJmuiden in the Netherlands, where it was scheduled to be installed on Seajacks Scylla . The hammer was delivered in IJmuiden together with accompanying components such as power packs, hose winches, hoses, a control cabin, and spare parts containers.

Seajacks Scylla is carrying three flanged monopiles per each trip to the construction site. There, the monopiles are upended and then driven into the seabed by the S-4000 Hydrohammer.

The delivery of the hammer for Seajacks Scylla followed the load out and transportation of another S-4000, together with two power packs and a hose winch, to Cuxhaven in Germany. There, GeoSea replaced the S-3000 Hydrohammer with the S-4000 on its jack-up vessel Innovation , which completed the installation of all 54 monopiles at the Nordsee One wind farm with the S-4000 after having already installed the first 30 monopiles with the S-3000.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago