offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Siem Aimery Christened and Ready for German Offshore Wind Projects
Grid Connection

April 29, 2016 · about 10 years ago

Siem Aimery Christened and Ready for German Offshore Wind Projects

The cable-laying vessel Siem Aimery, the latest vessel added to the Siem Offshore fleet, was christened in a naming ceremony on Wednesday, 27 April, at the Remontowa Shipbuilding yard in Gdansk, Poland. The vessel will now undergo final mobilisation prior to commencing cable loading activities for i

2 minutes read
  • LinkedIn
  • X
  • Email

The cable-laying vessel Siem Aimery, the latest vessel added to the Siem Offshore fleet, was christened in a naming ceremony on Wednesday, 27 April, at the Remontowa Shipbuilding yard in Gdansk, Poland.

The vessel will now undergo final mobilisation prior to commencing cable loading activities for its first project assignment. The Siem Aimery and her installation partner vessel, the Siem Moxie, will be installing the inner array grid and export cable systems for the 332.1MW Nordsee One offshore wind farm in the coming months.

Thereafter the vessel will continue with the winter installation campaign of the inner array grid cable system of the 402MW Veja Mate offshore wind farm in the German Bight.

Regis Rougier, Managing Director of Siem Offshore Contractors, said: “I am delighted to have the Siem Aimery in our fleet, with the Siem Moxie and the Siem Aimery working in tandem, we have the best of breed installation spread available. They are a unique team of vessels that will ensure that we safely deliver our projects on time for our customers. We are planning an event later this year, where we will invite customers to visit the Siem Aimery, right now our focus is on getting the vessel into the field for her first assignment.”

The Siem Aimery has been specifically designed and built for the installation and repair of medium and high voltage submarine cables. Having two carousels low in the vessel’s hull and a hangar-based cable deck, she is specifically designed to work in the adverse weather conditions. Siem Offshore Contractors has a long term charter agreement with Siem Offshore and will be responsible for the operations of the vessel.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionVesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

11 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago