offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Blue Water Taking Care of Block Island Turbine Parts
Vessels

May 23, 2016 · about 10 years ago

Blue Water Taking Care of Block Island Turbine Parts

Blue Water USA has been providing hub logistics services to General Electric (GE) in the Port of Providence, Rhode Island, for the 30 MW Block Island wind farm project since December 2015. The scope of the services includes heavy lift and storage of turbine components for the first offshore wind far

1 minutes read
  • LinkedIn
  • X
  • Email

Blue Water USA has been providing hub logistics services to General Electric (GE) in the Port of Providence, Rhode Island, for the 30 MW Block Island wind farm project since December 2015.

The scope of the services includes heavy lift and storage of turbine components for the first offshore wind farm in the United States, as well as warehouse management and support activities related to the tower assembly work. The Blue Water personnel on site in Port of Providence are working closely with local sub-contractors to perform the services.

In addition to the hub logistics in the Port of Providence, Blue Water has also been performing the transport of the wind turbine components, namely the tower sections from Aviles in Spain and the blades from Denmark.

Built by Deepwater Wind and located three miles off the coast of Block Island, the wind farm is scheduled to come online at the end of 2016 and generate 125,000 megawatt-hours of electricity which is enough to meet 90% of Block Island’s power needs.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
Fixed-Bottom

Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point

11 days ago
South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

12 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago